The aim of the project was to add a first floor with various extra rooms to an existing bungalow, therefore the work we undertook for this building re-development was quite extensive.
Before we began dismantling the roof, all electrics and plumbing had to be disconnected犀利士
as the month of March can get a bit wet. Once everything was protected and safe, then we began to remove the entire roof with ceiling below and replace it with a new roof comprising of pre-formed attic trusses which then are used as the basis to form a completely new roof with seven dormer windows in it.
Then a new first floor is formed with additional bedrooms and bathrooms with a staircase from below.